MICROCEMENTO FONDO

Component of the Base product in the Microcement system.Lightly-textured cement-based coating for smoothing and levelling base surfaces prior to applying the Microcement System
Use
Plaster finishing
Finish
Matt
Formats
15KG

applications

  • Plaster finishing
  • Cement
  • Porcelain stoneware
  • Fibre-cement
  • Stoneware
  • Without the need for complex and inconvenient works that cause noise, debris and dirt

How to apply?

  • Stainless trowel

Colors

The product itself is white. No need to color it, since it acts as a base and shall be covered with thin layer of decorative finish Microcement
The ideal application temperature is between 5 and 30º C. This range must be maintained for the first 72 hours. Try not to apply in temperatures above 35º C to avoid the product drying out too quickly.
The materials must be prepared so that their temperature is within the temperature range specified above. If the Microcement Base is very warm due to indirect sunlight, this could lead to problems due to loss of workability and premature setting.
Changes in ambient temperature during application also change the material's setting and drying times.
Preparing the mix:
Pour the 15kg bag of Microcement Base onto the 5kg of resin that has already been transferred to the 15L container that comes with Microcement Base in powder form. Add it little by little and beat slowly using a mechanical stirrer until you are left with a uniform, lump-free paste.
Use a steel trowel to apply 2 to 3 thin layers depending on the application, leaving 2 to 3 hours between coats until you achieve a smooth and level surface. (This time may be adjusted up or down, depending on the environmental conditions at the time of application)Coverage per coat 1/kgm2 (approx 0.
5mm thick).
Total coverage: 2-3 kg/m2 (1-2 mm thick).
After 24 hrs, we can sand off any imperfections with 120/180 sandpaper.
Clean up all the dust produced.
We then finish with Microcement Finish in the chosen colour.
Microcement Base is not recommended for base surfaces that contain water such as swimming pools, tanks or baths.
Soporte Nuevo:
New Base SurfacesThese must be firm and clean and free from any oil, grease, paint, dust or any other contaminant that hinders adhesion.
You must also check the degree of humidity (avoid waterlogged base surfaces) or water-repellance of the base surface.
-Concrete, cement and resin flooring in good condition, gentle sanding followed by vacuuming of the dust.
-On ceramic coatings in good condition: Clean and remove all traces of grease and contaminants from the surface.
Vertical walls-Remove dirt and vacuum dust. You do not have to remove paint if it is water-based, in good condition and with good adhesion, with the exception of satin paint or water-based or solvent-based enamel, in which case you will have to open the pore.
Given the strong adhesive properties of Microcement Base, a bonder only has to be used in the following cases:
Epoxy Floor Primer¬ Surfaces where there may be moisture seepage¬ Ceramic surfaces in contact with water¬ Polished surfaces (concrete) where it is suspected that the blasting has been insufficient¬ Any surface where we wish to ensure perfect adhesion.
Do not apply a layer of the product thicker than 1mm. Apply subsequent coats of microcement when the epoxy primer is still mordant, approx. 3-4 hrs after application.
- Imprimación 100% sólidos + Cataliz. (Monto Ind.
): If it is necessary to regularize and level support.
- Fijamont Aqua: Vertical walls where the surface is crumbling or there are remains of paint- Sellalux Sealant: for wood.
Partitions and joints-The position of the expansion joints must match those in the base that acts as the base surface.
-Using a fibreglass mesh as a reinforcing mesh will enable us to create surfaces with no partitions or joints. This is always recommended when used in flooring applications. This is not necessary on vertical surfaces except in very specific cases where greater mechanical resistance is required.
-When applying to large surface areas, do not interrupt the work in order to avoid junctions. Restauracion y Mantenimineto:
Restoration and maintenanceConcrete, cement and resin flooring in bad condition:
Sand blasting to remove contaminants and optimise the surface for better adhesion.
Repair any holes or cracks in the surface.
Ceramic coatings in bad condition, remove fully if you cannot guarantee perfect adhesion on the base.
Vertical wallsPaint in bad condition, remove fully by sanding or another mechanical means.
Once the base surfaces have been treated, check the adhesion and proceed as you would with NEW BASE SURFACES.

Downloads

I´m interested in this product
I´m interested in this product

Confirm the product and your contact information to be able to inform you and advise you in a personalized way.

Readily available stock

Gestión automatizada de las ubicaciones y las existencias de los productos.

Perfect orders

Los pedidos son preparados mediante radiofrecuencia reduciendo los errores en su preparación a 0.

Warehouse management

Ubicación automática de los productos en el almacén mediantes transelevador.

Fast loading

8 loading docks for 24-ton trucks.

Our own transport

Flota propia de camiones de reparto preparados para transporte ADR.

We are always close by

Cadena de tiendas propia y suministro a puntos de venta en toda España.