MONTOPLAC APAREJO

Preparation spray for regulating prefabricated plasterboard for interior partition walls. Evens out the surface, completely covering the board, joints and putties. Very easy to sand and finish with any quality of paint, allowing a perfectly smooth finish to be achieved.
Use
Indoors
Finish
Matt
Performance
2 - 4 m²/KG
Drying time
30-60 min
Formats
25KG

applications

  • Indoors
  • Work surfaces: plaster, cement, concrete, brick, plasterboard...
  • Partition walls: fibre-based plasterboard, laminated plaster, drywall etc.
  • Dripping effect and textured and / or rough surfaces

How to apply?

  • Air-less gun

Colors

White
Apply using airless projection equipment. Nozzle 27 - 31 and fan, depending on the application surface (4,5,6). Equipment Pressure 2000 - 2500 psi. (variable depending on the length of the hose).
Add 0 - 500 g of water per 25 kg drum and mix itApplication system for partition walls:
Apply a first coat of Montoplac preparation, approx. 300 microns when wet (approx. 3.
5 m2/kg)Leave to dry for approximately 30 minutes, depending on the ambient conditions.
Apply a second coat of Montoplac preparation, approx. 400 microns when wet (approx. 2.
5 m2/kg)Approximate final coverage - two coats of 0.
6 - 0.
7 kg/m2Leave to dry for 24 hours and sand with 150 grit sandpaper. Remove dust.
Note:
“The Montoplac Aparejo can be applied by rollers on the surfaces described above, making sense this application if the surface to be applied has small dimensions.
The roller to be used is made of polyamide (floor rollers for example).
It is advisable to apply to two minimum coats, with performance of 3 m²/kg, waiting time between coats of 2 hours minimum and sanded at 24 hours with medium grain sanding (grain 150-220).
’For finishing on Montoplac preparation:
For high quality paints, use fixing emulsion (Emulsión Fijadora) or Fijamont as a primer and apply 2 coats of paint, using putty between coats to fill in any defects.
For standard paints, use diluted product as a primer, then putty to fill in any defects and finish with a second coat.
Soporte Nuevo:
Cement/plaster putty:
Check that the putty is suitable for the substrate.
Wait until it has completely set (30 days minimum) Clean the substrate to remove any efflorescence and to neutralise alkaline surfaces.
Sand polished surfaces to make them more porous.
Clean the substrate to remove foreign substances and/or residues.
Open up any cracks or fissures to thoroughly clean them, remove dust that is produced using a brush, and then plaster themFor extremely thin surfaces, before applying putty, use an appropriate fixative (see family 6): Emulsión Fijadora, Fijamont, Fijalite.
Partition substrates:
The partition walls must be in perfect condition. Fill in joints and defects, leaving the partition walls ready to be finished with the Montoplac® system Restauracion y Mantenimineto:
Remove any foreign substances that have not correctly adhered to the substrate or that are in poor condition. Sand the substrate or use other mechanical means to open the pores if necessary. Test the adhesion, proceeding as if it is a new BASE.

Certifications

Downloads

I´m interested in this product
I´m interested in this product

Confirm the product and your contact information to be able to inform you and advise you in a personalized way.

Readily available stock

Gestión automatizada de las ubicaciones y las existencias de los productos.

Perfect orders

Los pedidos son preparados mediante radiofrecuencia reduciendo los errores en su preparación a 0.

Warehouse management

Ubicación automática de los productos en el almacén mediantes transelevador.

Fast loading

8 loading docks for 24-ton trucks.

Our own transport

Flota propia de camiones de reparto preparados para transporte ADR.

We are always close by

Cadena de tiendas propia y suministro a puntos de venta en toda España.